Project Details
Premier Engineering was appointed to deliver the full supply and erection of structural steelwork for a new canopy at the Nestlé factory in Tutbury. The project included detailed design and engineering of all steel connections, the production of manufacturing drawings for approval, and precise fabrication to meet BS:5950 standards. All steelwork supplied was Grade S355 U.N.O and hot-dip galvanised to a minimum 85-micron coating for long-term durability.
Our scope also involved forming accurate entry points through existing cladding to accommodate the new steelwork, as well as supplying holding down bolts for casting by Alpha Construction. Full structural steel erection was carried out by our experienced team, ensuring a safe and efficient installation.
Canopy structural steelwork project gallery
For more information and enquiries regarding the structural steel canopy for the Nestlé factory at Tutbury, please contact Premier Engineering directly
Telephone: 01226 779544
Get social and share this project