Project Details
Premier Engineering was appointed by Millpark Construction to deliver the structural steelwork package for the central Co-op store in Hambleton. Our scope included the supply and installation of structural steelwork, cold rolled sections, and associated accessories – all completed to UKCA Execution Class 2 standards.
We carried out detailed site surveys and produced full connection design and manufacturing drawings for approval. Our team managed the project from design through to completion, including fabrication, primer finishing, delivery, and offloading. The installation phase was supported by the provision of appropriate lifting and access equipment, ensuring a smooth and efficient build on site.
CO-OP structural steelwork project gallery
For more information and enquiries regarding the structural steelwork package for the central Co-op store in Hambleton, please contact Premier Engineering directly